2007-2008 Board of Directors Accomplishments
- Replaced score stands.
- Raised the level of backstop and went straight up with the backstop on Field #5.
- Reattached netting on field #5
- 2 New Batting Cage one upper fields, one on the lower fields.
- Additional Trash Cans and facilitieson Lower Fields
- Built Road behind Field #1.
- Drainage behind left field fence on Field #1 at the front entrance
- Railing at Front entrance
- Striping of Parking Lot to add additional parking spaces
- Added dirt to all fields
-
Concrete Work:
- Concrete in walk-way at main entrance
- Concrete under bleachers on fields 7 and 8
- Concrete between maintenance shed and asphalt
- Concrete pad for dumpster behind field #1
- Replaced fencing down the foul lines on Field #1, #6, #2, #3, #7, #8 to eliminate the curled fence at the bottom.
- Purchased a seeder used to over-seed with winter rye in the fall.
- Purchased and installed lighting controls that allow precise scheduling of lights and reduce the cost of lighting the fields.
- 2008 Fall Season the largest fall on record at Hobgood with over 800 participants.
- Revenue Generating Contract with Up Shots Photography
- Revenue Generating Contract with Sport Tee
- Split the 9s and 10s into two separate leagues.
- Moved scoreboards on Field #7 and #8
- Refurbished and/or replaced all bleachers on upper deck
- Redesigned and rewrite of our web-site.
- Rewrite of registration software and implementation of on-line registration.
- Revamped Coaching Seminar
- Installed electronic sprinkler controls replacing 1960s timer technology including commercial grade timers with rain sensors.
- Installed automatic flush mechanisms on majority of our toilets.
|
|
|
|
|